Skip to main content

Delivery

This category is about the work that misses the plan. One article is the P3 and P4 backlog: small bugs that stay open because the team is busy with incidents. The other is delivery predictability, and why deadlines slip when batch size and feedback are loose.

Both treat delivery as a system you can inspect: what entered the line, what got reviewed, and what slipped. They do not claim a cycle time for xSquads, and they do not cite a customer win. Use them to name the bottleneck before you add capacity. If the backlog is the problem, start with the bug piece. If the calendar is the problem, start with predictability.